- Area and boundary
- VCEDA reports 3,153 acres (1,276.3 ha) controlled by Buchanan County IDA for the broader Southern Gap development. A separate regional inventory reports approximately 3,000 gross industrial-park acres, 1,100 available acres, and a 40-acre largest contiguous parcel; these are different scopes and inventory measures, not a single buildable-area total.
- Former land use
- Previously surface-mined/reclaimed coalfield land; official project documents describe Southern Gap as developed on previously mined lands.
- Terrain
- Appalachian Plateau upland setting; the current site inventory describes flat grading within developable acres. This does not mean the entire controlled acreage is flat or build-ready.
- Pads / phases
- No verified count of completed pads located. VCEDA's 2023 annual report identifies an approximately 20-acre Phase II industrial site and a roughly five-acre site for a proposed shell building; 2025 funding closed for a proposed 130-acre mixed-use project in Phase II. These are project areas, not numbers of ready pads.
- Infrastructure
- Regional inventory lists three-phase power, recently added fiber, natural gas, and Buchanan County PSA water/sewer lines; reported available capacities are 600,000 gallons/day water and 1,000,000 gallons/day sewer. The inventory notes the electric substation/transmission lines are offsite and identifies potential traffic issues.
- Access strategy
- State Route 744 and the U.S. 460/U.S. 121 Corridor Q connection. VDOT reported approximately 12 miles of Corridor Q open with remaining two miles scheduled for later construction; VCEDA's 2023 report recorded the 8.7-mile section from Breaks Park Road to Southern Gap opening in 2023.
- Business mix
- Documented uses include Virginia Employment Commission customer-service call center, Paul's Fan Company, Southern Gap Transportation and Logistics Center (operated by Southwest Virginia Community College), Southern Gap Outdoor Adventure, and Appalachian Power's Buchanan County office. A 2025 mixed-use proposal adds commercial, residential, and industrial components; it is a proposed phase, not a completed tenant mix.
- Public investment
- VCEDA approved up to $2.5 million in 2023 for an approximately 20-acre Phase II industrial site. In October 2025, VCEDA closed three grants totaling $1.6 million for separate Phase II/site-development projects, including a proposed 130-acre mixed-use development. Virginia's AMLER program also awarded $1.95 million in 2022 for an approximately 16,000-square-foot Southern Gap Regional Office Park shell building. These are distinct awards and project scopes; do not aggregate them as one park cost or assign regional Corridor Q totals to park acreage.
- Development status
- Active, multi-use development with existing tenants. Specific Phase II site and shell-building projects are in development; VCEDA's 2025 grant announcement says the 130-acre mixed-use and commercial/housing components are proposed projects. The park's remaining available area and pad-readiness should be reverified before any site-specific claim.
- Key lesson for Red Onion
- Publish separate, date-stamped measures for IDA-controlled land, gross industrial-park area, available acreage, contiguous parcels, graded pads, and funded phase projects. Reclaimed-land readiness depends on parcel-specific grading, utility capacity, access, and continuing public investment; regional development totals are not a proxy for park acreage or delivered jobs.